Work
Networks we have helped put in the ground.
A few projects that show what changes when design, data and field capture stop living in separate systems.
Telecom · 2025
National FTTH rollout
Cutting design turnaround from six weeks to four days across 180 000 homes passed.
Public sector · 2025
Municipal asset register
Consolidating four decades of infrastructure records into one auditable system.
Utilities · 2024
Shared utility corridors
Detecting conflicts between electricity, water and telecom before ground was broken.
Clients
Who we work with
NORTHLINKMETROGRIDCAPE FIBREAQUANETTERRA SURVEYOPENDUCT
In their words
What clients say
The design turnaround change was the headline, but the real shift was trusting the record again.
Tier-1 operator
They understood our permitting constraints better than the consultants who wrote them.
Metropolitan municipality
Migration was the part we dreaded. It was scoped honestly and it landed on time.
Regional utility
Have a project like these?
Tell us the scope and constraints. We will be straight about whether we fit.