Telecom · 2025

National FTTH rollout

Cutting design turnaround from six weeks to four days across 180 000 homes passed.

Client Tier-1 operator
Sector Telecom
Completed 2025
Engagement Platform + services
National FTTH rollout

The challenge

Design packs were assembled by hand across CAD, spreadsheets and a separate permitting system. Each suburb took roughly six weeks, and as-built drift meant the record and the ground disagreed within months.

What we built

A single spatial model in PostGIS with automatic LLD generation, permit drawing packs produced from the same source, and field capture reconciling back into the design.

Outcome

What changed

94% Faster design turnaround
180k Homes passed
1 Source of truth
Delivered

What was in scope

  • Automatic low-level design from high-level routes
  • Permit packs generated per municipal template
  • Field as-built reconciliation
  • Duct capacity and slack validation
Technology
PostGISMapLibreDjangoCeleryGeoTIFF